Presentation Topic: Route 29 (Main Street) Over Dan River, Danville, Virginia Open Spandrel Concrete Arches – New and Old, with 2026 Update
Registration: To register for this event, please click here.
Abstract: Two contrasting design and construction approaches for arch bridges; an aesthetic program for a bridge rehabilitation design that is responsive to its historic context; and an interesting story about a historically significant bridge.
The purpose of this project was to improve the Main Street crossing of the Dan River in the City of Danville. The existing seven span, 823-foot long, four-lane concrete arch bridge carrying Main Street was designed by Daniel Luten and constructed during the late 1920s. It had deteriorated significantly and was in need of rehabilitation or replacement. The intersections immediately north and south of the bridge are of primary importance and improvements to them were constructed. Two important objectives were to maintain the historic integrity of the existing bridge and to affect as few businesses and residences as possible. The bridge is a contributing element to four historic districts that surround it.
The Main Street/Riverside Drive intersection lies immediately to the north of the crossing. It needed to be widened to accommodate future year traffic. Additional lanes were constructed on a new two-lane bridge located west of the existing bridge. This additional bridge carries southbound traffic, while the renovated existing bridge carries northbound traffic.
The historic identity of the existing Main Street bridge was maintained by rehabilitating it in place. Existing concrete arches and piers were repaired while the spandrel columns and floor system were replaced in kind, with cast-in-place concrete. Its appearance will remain similar to the existing bridge by virtue of the arches and piers remaining. Architecturally designed form liners and pigmented concrete were also employed to this end.
The new bridge design consists of seven open spandrel arch spans totaling 818 feet. Each span includes four parallel arches. Each arch span contains two precast, conventionally reinforced segments having a channel shaped cross section. At the crown, the arch segments were supported on a temporary bent and connected with post-tensioning through a cast-in-place concrete closure beam. The precast arch section was then filled with reinforced concrete. A detailed sequencing procedure was used to assure a balance of loads and stresses for each construction stage. The floor system is framed with continuous AASHTO girders spanning from the arch crown to the adjoining substructure units.
The intent of the aesthetic design is for both bridges to share common elements while having their own identity. A custom designed, open handrail was constructed on both bridges.
The project was completed during 2006. Since that time, the historic bridge structure has been modified by adding a trail/bikeway. This presentation is updated to include this modification and other points of interest. A similar presentation has been made at an ACI annual convention and later at an ASCE/SEI Structures Congress.
Presenter: W. M. (Bill Davidge), PE – Structural Engineer, Retired
Mr. Davidge has been involved in the design and evaluation of hundreds of structures including a wide variety of types. Projects include highway and railway bridges (short, medium and long span), dams, towers, tunnels, and other underground structures. Building types have included offices, industrial plants, dormitories, medical and educational facilities, hotels, power generation facilities, museums, and many others. His knowledge and experience extends to inspection, structural analysis, force protection, construction management, and forensic consulting. Mr. Davidge has managed over 200 projects for WileyWilson, the firm from which he is retired. During his career there he also served as Transportation Market Manager, Dean of Structural Engineering, Department Manager, Office Manager and Vice President. He has been invited to speak at engineering conferences nationwide including those sponsored by ASCE, SEI, ACI, ASHE, and AWPA. He has been an active member, including holding offices, in many professional and technical organizations.
When: Tuesday, December 8th, 2026
11:45 AM -12 PM – Sign in and Networking
12 PM -1PM – Presentation
Where: Libbie Mill Library, 2100 Libbie Lake E St., Richmond, VA 23230
Registration Price:
Members: $15 members (In-Person & Virtual)
Non-Members: $20
Late Ticket: $20 ($25 Non-Members)
Students: Free
Lunch is included with purchase of ticket.
PDH: 1.0 HR